top of page
Akış Yapı Üretim Tesisi Ve İdari Bina Projesi
Place
Kocaeli / Gebze Osb
Type of Business
Anahtar Teslim
Total Construction Area
21.000 m2
Total Construction Area
600 Ton
As a result of the demolition of a certain part of the existing Sheraton hotel structure, the reinforced concrete rough constructions of additional buildings, parking garage areas, pools, villas and the residence section were completed.
bottom of page